a | Basic requirements |
b | Out-of-phase |
c | Short-line fault |
d | Load switching |
e | Line-charging |
f | Cable-charging |
g | Single capacitor bank |
h | Back-to-back capacitor bank |
i | Capacitor bank inrush making |
j | Dielectric |
k | Temperature-rise |
l | Mechanical operating |
m | Mechanical endurance and/or environmental |
n | Radio interference (RIV) |
o | Verification of spark production class |
p | Error measurements |
q | Bus-transfer/Bus-charging current switching |
r | Rapid autoreclosing |
s | CO-15 s-CO |
t | Induced current |